As part of Council’s commitment to improving road safety and transport connectivity, we're planning to make improvements around Corrimal Train Station so that your journey is a safer one.

About the project

We're working with Transport for NSW to improve two locations around Corrimal Train Station. This project is part of Transport for NSWs ‘Transport Integration and Placemaking’ program to improve access around selected train stations across our city. We want you involved throughout our planning so that these proposed changes will suit your needs and improve your experience at Corrimal Station.

Murray Road is a key connection for people travelling from Corrimal Train Station to school, the shops, and the beach. We’ve identified a number of improvements we can make along Murray Road, which we are sharing with you. We also have plans for further improvements on Railway Street, Corrimal. Together, these projects will support access to Corrimal Train Station to ensure your journey to catch the train is a safer one.

Murray Road - What are we proposing?

Murray Road is a key east-west connection through East Corrimal to many attractions along the way to the coastal shared path. The draft concept design includes 

  • A 950m shared path along Murray Road to link Corrimal Train Station to the existing coastal shared path.
  • Five new raised pedestrian priority crossings.  

Railway Street - What are we proposing?

Railway Street is a local, yet busy road running in an east-west direction north of Corrimal Station. There are currently no pedestrian crossings at Railway Street near Corrimal Station. The draft concept design includes:

  • Installing a refuge island on Railway Street, close to Ruddock Street.
  • Add supporting kerb ramps, signage and line marking.

Where is this project up to?

We began consultation with the community from August - September 2024 to welcome feedback on our proposed changes to Corrimal Train Station, including Murray Road and Railway Street. This consultation has now concluded. 

Our Transport Team is now working through all that was heard throughout this project. You can still view the draft concept designs for this project and see what we have planned:

How will community feedback be used and what are the next steps?

In the first phase, we were asking for your feedback on our draft concept designs. We’re interested to hear your local knowledge and ideas.

In the second phase, we will check back in with the community to finalise the detailed designs and take any last comments before we start construction.

Construction is planned for 2025/2026 - 2026/2027 financial years as listed in our Infrastructure Delivery Program.

Have questions?

You can give us a call on 4227 7111 to speak with the Engagement Team, or email engagement@wollongong.nsw.gov.au and we will get back to you.

Accessibility and language assistance

If you’re d/Deaf, hard of hearing or have a speech or language difficulty, you can contact us through the National Relay ServiceIf you need an interpreter, you can contact us through the Translating and Interpreting Service on 131 450. You’ll need to provide our phone number 02 4227 7111 for either service.

Submissions become public documents and may be viewed by other persons on request. Please read Council’sPrivacy Notification before submitting your feedback.

As part of Council’s commitment to improving road safety and transport connectivity, we're planning to make improvements around Corrimal Train Station so that your journey is a safer one.

About the project

We're working with Transport for NSW to improve two locations around Corrimal Train Station. This project is part of Transport for NSWs ‘Transport Integration and Placemaking’ program to improve access around selected train stations across our city. We want you involved throughout our planning so that these proposed changes will suit your needs and improve your experience at Corrimal Station.

Murray Road is a key connection for people travelling from Corrimal Train Station to school, the shops, and the beach. We’ve identified a number of improvements we can make along Murray Road, which we are sharing with you. We also have plans for further improvements on Railway Street, Corrimal. Together, these projects will support access to Corrimal Train Station to ensure your journey to catch the train is a safer one.

Murray Road - What are we proposing?

Murray Road is a key east-west connection through East Corrimal to many attractions along the way to the coastal shared path. The draft concept design includes 

  • A 950m shared path along Murray Road to link Corrimal Train Station to the existing coastal shared path.
  • Five new raised pedestrian priority crossings.  

Railway Street - What are we proposing?

Railway Street is a local, yet busy road running in an east-west direction north of Corrimal Station. There are currently no pedestrian crossings at Railway Street near Corrimal Station. The draft concept design includes:

  • Installing a refuge island on Railway Street, close to Ruddock Street.
  • Add supporting kerb ramps, signage and line marking.

Where is this project up to?

We began consultation with the community from August - September 2024 to welcome feedback on our proposed changes to Corrimal Train Station, including Murray Road and Railway Street. This consultation has now concluded. 

Our Transport Team is now working through all that was heard throughout this project. You can still view the draft concept designs for this project and see what we have planned:

How will community feedback be used and what are the next steps?

In the first phase, we were asking for your feedback on our draft concept designs. We’re interested to hear your local knowledge and ideas.

In the second phase, we will check back in with the community to finalise the detailed designs and take any last comments before we start construction.

Construction is planned for 2025/2026 - 2026/2027 financial years as listed in our Infrastructure Delivery Program.

Have questions?

You can give us a call on 4227 7111 to speak with the Engagement Team, or email engagement@wollongong.nsw.gov.au and we will get back to you.

Accessibility and language assistance

If you’re d/Deaf, hard of hearing or have a speech or language difficulty, you can contact us through the National Relay ServiceIf you need an interpreter, you can contact us through the Translating and Interpreting Service on 131 450. You’ll need to provide our phone number 02 4227 7111 for either service.

Submissions become public documents and may be viewed by other persons on request. Please read Council’sPrivacy Notification before submitting your feedback.

Consultation has concluded
  • Railway Street Engagement Findings from Phase 1 - Update December 2024

    Share Railway Street Engagement Findings from Phase 1 - Update December 2024 on Facebook Share Railway Street Engagement Findings from Phase 1 - Update December 2024 on Twitter Share Railway Street Engagement Findings from Phase 1 - Update December 2024 on Linkedin Email Railway Street Engagement Findings from Phase 1 - Update December 2024 link

    Thank you to everyone who participated in phase 1 of the engagement with our community on proposed changes around Corrimal Train Station.

    About the Project

    The community was being asked to share their thoughts on a proposed pedestrian island being installed in Railway Street, Corrimal.

    There were 30 submissions made in relation to the proposed works along Railway Street, Corrimal.

    Results

    Question 1: Do you agree that the installation of a pedestrian refuge will improve safety for pedestrians and cyclists in Railway Street and lead to better access of the station?

    Question 2: What do you think about the proposed location of a pedestrian refuge island on Railway Street?

    If you would like to understand the feedback in more detail, you can read the complete Engagement Report for this, and the 6 other train stations included in this project.

    Next Steps

    Council will now consider all the feedback provided by the community regarding the proposed changes to Railway Street, Corrimal.

    All feedback is important and is one factor in the decision-making process for Council. The graphic below shows some of the factors we consider in our decision making:

    This project will have another phase of consultation where the community can participate in. the second phase, we will check back in with the community to finalise the detailed designs and take any last comments before we start construction.

    All previous participants and the broader community will be notified via the Our Wollongong website.

  • Murray Road Engagement Findings from Phase 1 - Update December 2024

    Share Murray Road Engagement Findings from Phase 1 - Update December 2024 on Facebook Share Murray Road Engagement Findings from Phase 1 - Update December 2024 on Twitter Share Murray Road Engagement Findings from Phase 1 - Update December 2024 on Linkedin Email Murray Road Engagement Findings from Phase 1 - Update December 2024 link

    Thank you to everyone who participated in Phase 1 of the engagement with our community on proposed changes along Murray Road, East Corrimal.

    About the Project

    The improvements proposed for Murray Road were the largest and most significant across all 12 projects engaged on as part of the Transport Integration and Placemaking Project. The plans proposed:

    • A 950m shared path along Murray Road to link Corrimal Train Station to the existing coastal shared path in the east.
    • Five new raised pedestrian priority crossings

    There were 69 submissions made using the survey (online and hard copy) in relation to the proposed works along Murray Road, East Corrimal.

    Results

    Question 1: Do you agree that this plan will improve safety for pedestrians and cyclists along Murray Road and lead to better access of the station?

    Question 2: What do you think about the proposed 950m Shared Path on Murray Road?

    Question 3: We want to know if the locations for the proposed new raised pedestrian crossings are best for our community. Rate them:

    Question 4: Would you consider changing your travel habits in the future to include more walking, cycling and/or public transport after seeing these proposed changes along Murray Road?

    If you would like to understand the feedback in more detail, you can read the complete Engagement Report for this, and the 6 other train stations included in this project.

    Next Steps

    Council will now consider all the feedback provided by the community regarding the proposed changes to Murray Road, East Corrimal.

    All feedback is important and is one factor in the decision-making process for Council. The graphic below shows some of the factors we consider in our decision making:

    This project will have another phase of consultation where the community can participate in. the second phase, we will check back in with the community to finalise the detailed designs and take any last comments before we start construction.

    All previous participants and the broader community will be notified via the Our Wollongong website.